Iveagh Court

1/1

Location: Dublin

Client: MAC Group 

Description: Two systems were supplied and installed during this project. 

The first system included CBI Fully Steel Encapsulated panels 600x600x26, with a woodcore corner lock system and permaflor BGMS 600 x 600 x 30mm.  The structure incorporated adjustable pedestals with types ranging from 100mm through to 250mm. 

The second system involved adjustments and derocking to the existing raised access floor, the removal of all old carpet adhesive and upon completion the existing raised access floor was polished.
 

Both systems conformed to both BSEN 12825 and PSA MOB PF2 PS/SPU. 

Surface Area: 3,000 sqm